Back to the blog
Louis Airy

Louis Airy

COO of Argile

160 articles published

Louis is COO of Argile. After four years in strategy consulting and close to two as chief of staff in home adaptation and reuse, he joined Argile in March 2024. In daily contact with certified renovation companies, he follows French energy saving certificates, renovation subsidies and reduced VAT, and signs the blog's compliance content. He reads each decree and standardised operation sheet as it is published, and revises the affected articles when a rate changes rather than waiting for the next overhaul. What he writes is what he then checks against real quotes.

Argile is software for energy renovation companies and RGE-certified installers in France: AI-assisted building survey, equipment sizing to NF EN 12831-1, works plans and quotes with MaPrimeRénov' and CEE subsidies deducted.

Subjects covered

Energy saving certificatesFrench renovation subsidiesQuote compliance

Their articles

ContractorsNovember 17, 2026
DINplus or ENplus: choosing the right pellet certification

To qualify a “DINplus” bag on site, stick to the thresholds in the DINplus specification (DIN CERTCO): moisture ≤ 10%, ash ≤ 0.7%, fines in bag at delivery ≤ 1.0%, and mechanical durability ≥ 97.5%. These values frame what you can rely on in the event of fouling, auger jams or an after-sales dispute, but they mainly apply at the factory gate. If pellets go through bulk handling or storage outside the certified chain, ENplus A1 adds a traceability and logistics-control guarantee via the operator ID, which better secures the condition of the fuel on arrival.

6 min read

ContractorsNovember 15, 2026
Reversible air-to-water heat pumps: the limits of cooling by underfloor system

For underfloor cooling, a reversible air-to-water heat pump is first set to avoid condensation: aim for a supply water temperature of 18 to 20 °C and keep the floor surface around 19 to 21 °C, with the lower limit controlled against the dew point using a humidity sensor. These benchmarks, used during commissioning and recorded in the site file, are the ones retained in the body of the article (tables “Cooling supply temperature” and “Minimum floor surface temperature”) and they also frame the typical output, 20 to 35 W/m², far from air-conditioning comfort levels.

6 min read

ContractorsNovember 12, 2026
Glass wool or rock wool comparison for estimating

At the same thickness, glass wool outperforms rock wool thermally in most common ranges, with a typical lambda of 0.032 W/m.K versus 0.036 W/m.K for rock wool, as shown in the “Common products” comparison table in the body of the article. To secure the choice in the quote, keep this numerical benchmark, then decide the rest based on the product documents cited in the body — Declaration of Performance, ACERMI certificate and fire Euroclass: rock wool has the edge on fire, moisture, acoustics and blown-in stability, while glass wool remains the most competitive on price.

6 min read

ContractorsNovember 11, 2026
Emailing quotes: get the send right, prove delivery, and follow up effectively

Send your quote by email with a lightweight, uneditable PDF attachment, ideally between 2 and 5 MB, so it opens smoothly on mobile and is not blocked by email filters, as recommended in ADEME’s practical guide to low-impact digital use. In the subject line and body of the message, remind the client of the site visit date, the job reference, and the quote validity period, then offer the next step straight away (confirmation call or online signature). Keep proof of sending by archiving the email (.eml or .pdf with headers) and schedule the follow-up as soon as you send it, typically on day 2 and then day 7.

6 min read

ContractorsNovember 11, 2026
Expansion Joint in EIFS: Where It Must Be Installed and How to Price It

In EIFS, you must systematically carry every structural joint through to the finish with a system expansion-joint profile and compatible sealing, otherwise the crack will come back, even if the finish is redone. For field subdivision, the maximum spacing is not a “best practice”: it is prescribed by the system’s Technical Approval (DTA/ETA), with typical values from 6 to 12 m depending on the system, colour and exposure, and must be recorded and archived in the project handover file (DOE). In your quote, price it separately as linear metres of profiles, accessories and installation time, labelled “EIFS subdivision according to technical approval” rather than a simple render repair.

6 min read

ContractorsNovember 9, 2026
Smart home: measurable energy savings, not a gimmick

In the commercial sector, the requirement for automatic control of HVAC systems applies from 70 kW of capacity, with a deadline between 2025 and 2027 depending on the case, as set out in the BACS decree. In residential retrofit, it’s a good benchmark for separating what actually reduces kWh from what is just comfort. On your quotes and during inspections, only three levers stand up to measurement: time scheduling, coherent multi-zone control, and load shedding with documented restart rules.

5 min read

ContractorsNovember 8, 2026
Attic Access Walkway: Rules and Implementation

On site, plan for a decking system installed on raised supports, fitted before blowing or rolling out the insulation and set above the final insulation thickness stated in the quotation (2026 project reference). This basic rule, recalled in the CCTP applicable to attic insulation in your contract, prevents the access strip from being crushed and secures access from the hatch to the components that need maintenance. The walkway is fixed to the joists only, never to the ceiling, and must be detailed in the CCTP from the outset so it remains compatible with a continuous vapour barrier.

6 min read

ContractorsNovember 8, 2026
Gas Absorption Heat Pump: When to Choose It for Retrofit Work

In 2026, a gas absorption heat pump is mainly justified in the tertiary sector or in central plant rooms for multi-family buildings when you need to keep an existing high-flow-temperature distribution—typically 60 to 70 °C—while limiting electrical demand. In your quotations, state performance as net efficiency on LHV and give a ballpark figure around 1.4 to 1.7 depending on the EN 12309 test conditions, specifying the hydraulic operating temperatures and whether auxiliaries are included. In single-family homes, the extra cost, footprint, flue requirements, and the after-sales/service ecosystem make this a niche choice despite the low electrical draw.

6 min read

ContractorsNovember 6, 2026
Photovoltaic self-consumption: calculating the rate and producing a cost estimate

To publish a defensible figure, set out two distinct ratios and calculate them from hourly series. The self-consumption rate is calculated as PV self-consumed production / PV production, and the self-production rate (coverage) is calculated as PV self-consumed production / total consumption, with self-consumed(h)=min(Production(h), Consumption(h)) hour by hour as the balance rule, as defined in the body of the article. The worked example in the body sets the order of magnitude without control logic: at 3 kWp, 42% self-consumption and 31% coverage, then at 6 kWp, 27% and 40%, showing that increasing one can reduce the other.

5 min read

ContractorsNovember 5, 2026
False ceiling insulation: choosing thickness and target R-value

In residential buildings, an insulated false ceiling is no longer acceptable if the finished height drops below 2.20 m, the threshold used to determine the ceiling height taken into account for habitable floor area under Article R.156-1 of the Construction and Housing Code. To estimate the “lost” thickness, include the insulation and the assembly; for example, targeting R = 5 with mineral wool at λ 0.035 requires 175 mm of insulation, to which you typically add 47 mm of furring channel and 13 mm of BA13 plasterboard. The thermal bridge occurs at the perimeter, with an insulation upturn and continuity of the vapour barrier sealed to the wall before closing up.

6 min read

ContractorsNovember 5, 2026
Commercial conversion rate to guide your sales funnel

In the article body example, your overall conversion from received inquiries to signed quotes is 5% (5 signed quotes for 100 inquiries), and that is the figure you should monitor before discussing an isolated “signing rate.” This value comes from the numeric example “out of 100 inquiries, … 5 signed quotes” and from the step-by-step formulas, “signed quotes / issued quotes” and “successful contacts / received inquiries” set out in the formulas table in the body. By tracking the five funnel steps every week, you can pinpoint the real leak, often upstream at successful contacts to technical visits, rather than at the quote stage.

6 min read

ContractorsNovember 2, 2026
Insulated lost-formwork for slab-on-grade

Approved Document L sets no Psi value of its own for the edge of a ground-bearing slab. For new dwellings, it asks for perimeter insulation that is continuous and at least 25 mm thick, wall insulation carried at least one block height (215 mm) below the underside of the slab, and thermal bridges assessed by calculation to BR 497, from an independently assessed details library, from SAP Table K1, or at a default y-value of 0.20 W/(m²·K). The insulated lost formwork or insulated slab-edge block is the component that keeps this junction in check at the foot of the walls, provided it stays continuous with the under-slab insulation and the wall insulation.

7 min read

ContractorsNovember 2, 2026
Thermal efficiency: compare ETAS, COP and SCOP without mistakes

Regulation (EU) No 813/2013 calculates the seasonal space heating efficiency ηs, the ETAS, of a heat pump by dividing its SCOP by a conversion coefficient of 2.5, then subtracting corrections for controls. A boiler’s ETAS is read on the gross calorific value (PCS), which makes it comparable with a heat pump’s in primary energy, but never with a COP or a SCOP. The COP describes one test point, the SCOP a heating season on the Strasbourg reference climate: each indicator is compared with its own kind, at the same water temperature.

6 min read

ContractorsNovember 2, 2026
Multilayer pipe: key points to prevent leaks

Since the CCFAT decision of 21 November 2017, multilayer pipe has been a traditional technique in France: the technical assessments (“Avis Techniques”) for this family were cancelled on 31 December 2020, and installation is judged against the amended NF DTU 60.1 for domestic water and the UMGCCP professional rules for heating. A leak almost always starts at a fitting, from a poor cut, calibration or crimp. When an expert is called in, what protects the company is a file kept before closing up: a certified system, the instructions followed, a recorded tightness test and photos of the insertion marks.

6 min read

ContractorsOctober 29, 2026
Positive input ventilation: conditions of use, limits and alternatives

A positive input ventilation unit (PIV, VMI in France) blows filtered fresh air into the dwelling and puts it under slight overpressure, but it extracts nothing. The French arrêté of 24 March 1982 requires air outlets at least in the kitchen, bathroom and WC, with extract rates set by the number of rooms. A PIV unit therefore stands alongside an extract system that stays in place, not instead of it, and no French CEE ventilation scheme covers it.

6 min read

ContractorsOctober 24, 2026
Lambda coefficient: choosing the right value for your calculations

The lambda value to use is the one declared or certified for the product actually installed, not an average for its family. The French Th-Bât calculation rules convert it into a design value with a safety factor FR of 1 or 1.15 depending on where the declaration comes from and, where no value can be evidenced, impose default values that penalise the result: 0.055 W/(m·K) for glass wool of unknown density.

7 min read

ContractorsOctober 21, 2026
Degree day calculation: formula, records and use in sizing

A heating degree day (DJU in French) is calculated day by day from the minimum and maximum temperatures, on an 18 °C base, then added up over the month or the heating season. COSTIC, the French technical centre for building services engineering, which publishes the DJU of 100 stations, points out that this base comes from the general technical specifications (CCTG) for heating operation contracts and that it does not stand for the setpoint temperature. On site, degree days are used to correct a consumption for weather before comparing it, and to derive an order of magnitude of power from a known consumption.

6 min read

ContractorsOctober 15, 2026
Pricing an anti-burglary glazed front door properly

A glazed front door only counts as burglar-resistant if the complete door set has passed a test to NF EN 1627, which defines six levels from RC1 to RC6. At RC2 the unit must hold out for 3 minutes against a burglar armed with a screwdriver and pliers, at RC3 for 5 minutes with a crowbar. Laminated glass rated to NF EN 356 is only one component of that test: the quote must state the class of the door set, the test report and an installed configuration identical to the one tested.

6 min read

ContractorsOctober 7, 2026
Lightweight screed over timber floor: weight and installation

The weight of a lightweight screed comes from two figures: the dry density declared on the mortar's datasheet and the finished thickness. A mortar declared at 800 kg/m³ laid 50 mm thick weighs 40 kg/m², or about 0.39 kN/m² of dead load added to the joists. In France, NF DTU 26.2 (July 2026 edition) covers screeds and slabs made with hydraulic binders in new work, on the substrates defined in its clause 6: over joists, read that clause before relying on it and work from the product's Avis Technique or Document Technique d'Application, which sets the installation conditions, while NF DTU 52.10 covers insulating underlays beneath floating screeds.

6 min read

ContractorsOctober 5, 2026
Lined chimney: check the designation and connect an appliance

An existing lined flue is only connected once its designation has been read. It is set out under EN 1443 and shown on the chimney data plate. A code such as T450 N1 D 2 G50 gives, in order, the temperature class, the pressure class, condensate resistance, corrosion resistance, then sootfire resistance followed by the distance to combustible materials in millimetres. Each code is compared with what the appliance instructions require. On an existing flue, pricing comes after traceable checks: condition, continuity, tightness, sweeping access and outlet height.

7 min read

ContractorsOctober 2, 2026
Insulating screed: choosing thickness and performance

The thickness of an insulation screed follows from the target thermal resistance and the lambda declared by the manufacturer: e = R × λ. In France, for insulating a ground floor over an unheated basement, crawl space or open passage, the CEE energy savings scheme's BAR-EN-103 sheet requires R ≥ 3 m²·K/W without counting existing insulation, which means 180 mm of mortar at a declared λ of 0.06 W/(m·K). Where the height is not there, the R-value comes from an insulation board under a floating screed, installed under NF DTU 52.10, and the screed only spreads the loads.

6 min read

ContractorsOctober 2, 2026
Boiler pressure gauge: reading pressure and diagnosing issues

The gauge on a wall-hung boiler shows the gauge pressure of the heating circuit in bar, to be read with the system cold. Wall-hung boiler manuals generally ask for at least 1 bar cold and a fill pressure between 1 and 2 bar, and the relief valve opens at about 3 bar: these are manufacturer values, not regulatory thresholds. French regulation caps the heating water temperature at 100 °C (arrêté of 23 June 1978, art. 33).

6 min read

ContractorsSeptember 28, 2026
Construction quote and invoice: turning a quote into progress invoices

On a job billed as it progresses, the signed quote is the basis of every invoice that follows: the deposit invoice, the progress invoices worked out cumulatively line by line, then the final invoice. Under the Construction Act 1996, a construction contract entitles you to stage or periodic payments unless the work is expected to last less than 45 days, a contract with a residential occupier excepted. Retention, when the contract provides for it, is deducted from the payment without reducing the price invoiced, each variation is added to the contract total, and every invoice keeps its number in one continuous sequence.

6 min read

ContractorsSeptember 27, 2026
Construction ERP software: choosing it and rolling it out

Construction ERP software earns its place when coordination between quotes, purchasing, time tracking and invoicing no longer fits in spreadsheets: it runs each job as a project, with its own budget and its actual margin. In France, the e-invoicing timetable often speeds up the decision, since every business must be able to receive electronic invoices from 1 September 2026 and SMEs and micro-businesses will have to issue them from 1 September 2027. The choice comes down to functional scope and integrations; success comes down to tightly scoped configuration and a phased rollout.

7 min read

ContractorsJuly 24, 2026
Renovating a presbytery: religious heritage and performance

Renovating an old building tied to local history is a project where every choice matters. You need to gain comfort and energy efficiency without betraying the character of the place, or getting bogged down in unnecessary details. With a clear method and the right materials, you move fast, cleanly, and secure the result.

5 min read

ContractorsJuly 24, 2026
Water tightness in external wall insulation: handling run-off

Render-on-insulation systems sit under no British Standard code of practice of their own: the dimensions come from the system's own certificate, and the regulatory floor comes from Approved Document C. A damp-proof course at least 150 mm above adjoining ground, cavity trays with weep holes every 900 mm, and an exposure zone read off BS 8104 before the build-up is chosen.

6 min read

ContractorsJuly 24, 2026
Air leakage test: measuring airtightness

Air leakage testing is judged on an enforceable figure, not on a draught: 0.60 m³/(h·m²) of heat-loss envelope for a detached house, 1.00 for multi-unit housing, under article 19 of the French order of 4 August 2021. Two uplifts can move that target, sampling and works still to come after handover, and both are settled on site rather than in the report. Here are the thresholds, the corrections, and the report to demand from the tester.

5 min read

ContractorsJuly 23, 2026
Renovating a farmhouse: transforming an agricultural building

An agricultural building conversion is settled by two texts before it is settled on site: article L. 151-11 of the French planning code, which governs change of use in agricultural and natural zones, and the decree of 30 May 2016, which triggers insulation duties as soon as space is converted to habitable use. Here are the binding thresholds, the thermal resistances to hit, and what the survey has to record before any pricing.

5 min read

ContractorsJuly 22, 2026
Refrigerant charge: calculation and precautions

The refrigerant charge commands two things: how the machine performs and what you owe the regulator. The second is not read in kilos but in tonnes of CO2 equivalent, and the conversion is one multiplication by the GWP. Here is the conversion table by refrigerant, the leak check interval table, and what gets logged after every job.

5 min read

Energy renovationJuly 21, 2026
Trombe Wall: Passive Solar Heating Through the Wall

When your clients want to cut their bill without adding a complicated system, capturing the sun with a well-designed wall can make the difference. This simple principle turns an exposed wall into a heat reservoir that slowly releases warmth into the home, especially in mid-season. With the right design and installation habits, you gain a concrete, low-tech, durable selling point on your jobs.

5 min read

1 / 6

Next

Reveal your expertise

One demo, and you see your expertise proven.

Contact us