Sanitation before renovation: what to check in 2026

Before starting a renovation, your clients want concrete answers, not bad surprises mid-project. A poorly vented wastewater system, a saturated septic tank or a badly placed outlet, and the schedule derails, with costly rework. By checking a few simple points during the initial site visit, you secure the project and keep control of quality.

Identify the type of sanitation system and gather proof of compliance

Distinguishing mains drainage from non-mains sanitation (ANC) on site

On site, start by checking whether the building is connected to the public sewer. An inspection chamber at the property boundary, a water bill mentioning the "mains drainage" charge, or a visible connection toward the street often point to the diagnosis. Conversely, an all-water septic tank, a micro-treatment plant, a compact filter or a soakaway field signal a non-mains system, which needs checking before any plumbing or earthworks lot.

Finding the useful documents: SPANC reports, plans, invoices, manuals

For proof, look for the SPANC inspection report, as-built plans, installation invoices and recent emptying receipts, as well as maintenance manuals (micro-treatment plant, lifting station). On mains drainage, ask for the connection certificate, proof the connection is compliant, and keep correspondence with the town hall or the wastewater department.

Spotting signs of a non-compliant sanitation system before starting the renovation

Before starting the renovation, look for odours, backflows, abnormal damp, broken manhole covers or a saturated soakaway field. A lack of ventilation, a discharge into a ditch, or a recurring micro-treatment plant alarm are signals to deal with right away. It is better to secure compliance than to reopen the floors after finishing. To go further, see the pre-renovation diagnosis.

Carrying out on-site checks before your renovation works

Checking inspection chambers, pipework and slopes: what you can check without breaking anything

Before opening a wall, start outside. Accessible inspection chambers that are clean already let you see whether flow is normal. With a torch, spot deposits, roots, visible cracks. A simple bucket-of-water test helps confirm drainage.

  • Open the covers and check that the water level drops without stagnating.
  • Check the condition of the joints and the alignment of the pipes.
  • Spot areas where the slope seems broken or has sunk.

Checking wastewater and rainwater discharge to avoid backflow

A key point in sanitation is distinguishing wastewater from rainwater. Check where the downpipes discharge, and whether there is an overflow. In sensitive areas, fitting a non-return valve is worth discussing to limit backflow during heavy rain.

Tracking down leaks, infiltration and odours: clues to note during the site visit

On site, note signs of damp at the base of walls, ceiling stains, saltpetre, blackened joints. A persistent sewage smell can signal a dry trap, a faulty vent, or a small leak. Take dated photos — they make diagnosis and pricing easier.

Anticipating risks to the building and to energy performance

Protecting insulation and walls: damp, rising damp, mould

Before adding insulation, identify at-risk areas. Dark stains, odours, blistering render, saltpetre. Persistent damp ruins performance and can degrade timber, plaster and linings. Check how water is managed. Gutters, sloped ground, drainage, waterproofing at the base of walls. Then adapt materials and vapour barriers to the building's moisture level.

Avoiding post-renovation problems: slab, crawl space, basement, foundations

An effective renovation shifts the balance. Floors and walls become warmer, but the cold zones move downward. On a slab, in a crawl space or basement, check water inlets, the presence of a film under the slab, and thermal bridges at the edges. Watch for ground movement and active cracks before closing up the walls.

Sanitation and ventilation: checking the balance to limit condensation

Good airtightness without ventilation guarantees condensation. Measure air flow rates, the condition of vents, air inlets and duct draw. Where sanitation issues or a damp basement are present, favour continuous air renewal and well-adjusted extraction. You limit condensation, mould and site rework.

Choosing corrective actions and sequencing the works in the right order

Repair, rehabilitate or replace: how to decide based on the state of the sanitation system

Base your decision on the SPANC report and an on-site inspection. A localised fault (broken pipe, sunken chamber, dead pump) is often quick to fix. If the system is undersized, clogged, non-compliant or unsuited to the soil, a rehabilitation or full replacement avoids having to come back. Decide using three criteria: health risks, target service life, and total cost — works plus maintenance.

Planning the sequencing: sanitation, networks, earthworks, then renovation

Start with the sanitation system and all buried networks: wastewater, rainwater, drinking water, electricity. Then do the earthworks, drainage and levelling. This logical order avoids breaking newly finished work and secures the schedule. Only then move on to renovating the building: structure, airtightness, then insulation and systems. To frame a broader renovation carried out in stages, formalise the work packages and their dependencies as early as the quoting stage.

Securing the site: access, trenches, protection, restoring the surroundings

Before digging, locate the networks and file the DT-DICT utility request if needed. Organise stable access for machinery, mark out and protect traffic zones. For trenches, plan for battering or shoring depending on depth and soil type. At the end of the job, compact the ground, restore slopes, repair surfaces and keep a plan of the networks.

Preparing the final check and the obligations to know in 2026

Inspection and sign-off: when to call in SPANC or the sanitation department

On a sanitation job, plan the inspection ahead of time. Contact SPANC as early as the design stage if you are on a non-mains system, then schedule a site visit before backfilling to validate the layout, slopes and materials. On mains drainage, the sanitation department may require a connection and compliance check before putting the system back into service.

Sale, rental, works: the regulatory points that affect renovation

When selling a home on a non-mains system, an inspection less than 3 years old is generally required. If non-compliance is found, works can be mandated within a set timeframe, to be clarified in the deed of sale. In areas connectable to the mains, connecting to the public sewer can become mandatory. Also check local regulations, especially within a groundwater catchment protection zone.

Job-site file: photos, diagrams and inspection reports to prove the check was done

Put together a simple, solid file. Dated photos of trenches and structures before closing up, an "as-built" diagram, product references, soil-disposal tickets, and the SPANC or sanitation department's site-visit report. You save time at handover, and you protect a future sale.

Key figures

5 million

Septic tanks in France

40–60%

Non-compliance

€5,000–15,000

Compliance works

Frequently asked questions

Check that a SPANC inspection (the French public non-mains sanitation authority) has been carried out, and when: where non-compliance poses a health or environmental risk, works can be required, often within about 1 year of the sale. Also make sure the installation complies with the amended decree of 7 September 2009 (sizing, ventilation, discharge), and that the renovation project does not change usage without resizing the system.

Louis Airy

COO of Argile

Further reading

ContractorsJuly 24, 2026
Smart thermostat and algorithmic learning

Good heating control is no longer just a fixed setpoint. On the job site, you can offer settings that adapt to the household's rhythms, free heat gains and weather variations, improving comfort without overconsuming. Understanding how the device "learns" and what data it uses helps you avoid vague promises, ask the right questions to the client and secure the commissioning.

5 min read

ContractorsJuly 24, 2026
Renovating a presbytery: religious heritage and performance

Renovating an old building tied to local history is a project where every choice matters. You need to gain comfort and energy efficiency without betraying the character of the place, or getting bogged down in unnecessary details. With a clear method and the right materials, you move fast, cleanly, and secure the result.

5 min read

ContractorsJuly 24, 2026
Cold roof vs warm roof: which configuration to insulate?

On a job site, choosing the insulation under the roof covering isn't just a technical question. You're the one who has to decide between thermal performance, moisture management, available height and ease of installation, without overcomplicating things. With the right approach, you secure comfort in both summer and winter, and you avoid the problems that come back to cost you.

5 min read

Reveal your expertise

One demo, and you see your expertise proven.

Contact us