News

Articles by Argile

Regulation, field practice and tools: our analysis to help renovation professionals sell and deliver energy retrofits.

ContractorsMay 28, 2026
Health and housing: illnesses linked to a degraded building envelope

In a damaged home, it's often the small defects that trigger the big callbacks. Moisture setting in, odours coming back, occupants complaining and your schedule blowing up. By spotting the signs quickly and setting up a simple diagnosis, you secure your work, reassure the client and turn a complicated renovation into a clean, controlled intervention.

5 min read

ContractorsMay 28, 2026
Failed renovation: the 7 most frequent causes

When a project goes off the rails, it's often a small decision made early on that ends up costing dearly in time, margin and reputation. As a tradesperson, you can secure the result from the preparation stage, by framing the needs, the interfaces between trades and the checkpoints at the right time. The idea is simple: avoid recurring pitfalls before they turn into rework.

5 min read

ContractorsMay 28, 2026
Hybrid ventilation: the compromise between natural and mechanical

Between recurring damp, lingering odours and clients who want comfort without a rising bill, you're looking for a solution that's simple to explain and reliable to install. Hybrid ventilation relies on natural draught when that's enough, and switches to assisted mode when the home really needs it. It secures air quality without over-equipping the job.

5 min read

Energy renovationMay 27, 2026
Energy independence and renovation: the geopolitical stake

Between shifting prices and uncertain supply, your projects are no longer just a technical matter. In renovation, every decision on insulation, heating, or ventilation can reduce dependence on imported energy and protect your clients' bills. It's up to you to turn this geopolitical context into concrete work, easy to explain and profitable to carry out.

5 min read

Energy renovationMay 27, 2026
Climate well: preheating air using the ground

When you're looking to improve comfort without pushing up the bill, the ground can become a real ally. By routing fresh air through a buried duct, you temper it before it enters the building, which helps smooth out cold and heat peaks. The result is a solution that's simple to explain to the customer, provided you take care with the layout, drainage and maintenance from the job-site stage.

5 min read

ContractorsMay 26, 2026
Monobloc heat pump: the benefits of a simplified installation

On a job site, every hour saved counts. With a monobloc solution, you cut down on the connections to make and move faster, with fewer sensitive points to watch. From preparation to commissioning, you keep control of a clear process, so you deliver cleanly and without surprises.

5 min read

ContractorsMay 26, 2026
Security door and thermal insulation: a necessary trade-off

Two texts govern the subject, and neither says what people assume. The French order of 3 May 2007 imposes Ud ≤ 2 W/(m².K) when an external entrance door of a detached house is replaced, but its article 8 takes out of scope any element with a particular characteristic, burglar resistance included, along with every entrance door other than a detached house one. In flats the governing text is the fire order of 31 January 1986, and it speaks in fire integrity ratings, not in thermal coefficients.

5 min read

ContractorsMay 26, 2026
Site handover: the quality control checkpoints

On the day the client walks the site with you, everything comes down to the details. With a simple method and a few checkpoints, you secure quality, avoid costly rework, and walk away with a clear file. For you, it's the moment to turn the end of a job into a real, clean validation, with no grey areas.

5 min read

ContractorsMay 25, 2026
Octopus PEX manifold system: modern floor distribution

A manifold network is not just easier to install: on hot water it is the simplest way to keep dead legs short, and the dead-leg volume is what decides how long your customer waits at the tap. That volume converts straight into a maximum run length for each pipe size. Here are the lengths to work to and the installation habits that go with them.

6 min read

Argile productMay 25, 2026
Shape factor and compactness: why the cube reigns supreme

When you're trying to hit a thermal performance target without blowing up the insulated surface area, the geometry of the building already does part of the job. A simple volume, close to a cube, limits the walls in contact with the outside, and so the losses and the thermal bridges to treat, for a job that's easier to read and often more profitable. That helps you frame your choices on insulation, windows and heating faster, without unnecessary overkill.

5 min read

ContractorsMay 25, 2026
Heating needs < 15 kWh/m²/year: how to achieve it

Reaching below 15 kWh/m²/year in a retrofit comes down to the details that make the difference on site. You already have the right instincts — the challenge is getting the envelope, airtightness and ventilation right to avoid the “small leaks” that drag down the result. With a clear method and a few checks at the right moments, you secure both performance and client satisfaction.

5 min read

ContractorsMay 25, 2026
Site coordination for whole-house retrofits: the keys to success

On a whole-house retrofit, the difference is often made by day-to-day organisation. When the right trades arrive at the right time, you avoid rework, slipping deadlines and impatient clients. With a simple method for preparation, follow-up and handover, you keep control of quality, schedule and margin.

5 min read

Reveal your expertise

One demo, and you see your expertise proven.

Contact us