Heat pump: distances to neighbours, clearances and noise

No rule sets a minimum distance between an outdoor unit and a boundary line. What binds you are the installation clearances, the noise limit that applies at the assessment position, and whatever the local planning regime adds on top. The rest is site management, and it has to be written down.

Contents

No rule sets a national minimum distance between a heat pump outdoor unit and a boundary line. What binds you are the installation clearances, and where a manufacturer is silent the French NF DTU 65.16 gives a usable benchmark: 0,50 m on the air intake side, 1,50 m on the discharge side, 1,50 m on the connection side for access, and 0,50 m above the unit. On noise, permitted development is governed by MCS 020, which sets the sound limit at 42 dB(A) at the assessment position, that is the closest neighbouring habitable room, leaving an effective emission limit of 37,0 dB(A) once the nominal 40 dB(A) background is accounted for.

The distances that actually bind you around the unit

Installation clearances

These are the only distances imposed by good practice. They do not protect the neighbour, they protect the machine and whoever has to service it: without them the air recirculates, output drops and maintenance becomes impossible.

Around the outdoor unit Minimum clearance
Air intake side 0,50 m
Air discharge side 1,50 m
Connection side, free access for servicing 1,50 m
Above the unit 0,50 m
Pipework liable to freeze 1,50 m from the unit
Pipework in the direct path of discharged air 3,00 m

These values apply unless the manufacturer specifies greater distances, and the manual always wins where it is more demanding. The 1,50 m on the connection side is the one most often sacrificed in a tight yard, and the one that costs the most at the first service call.

What distance to the neighbour really buys

In free field, for a source that behaves like a point, the perceived level falls by 6 dB for every doubling of distance. It is arithmetic, and it is the most cost-effective lever on the job.

Distance from the source Attenuation relative to 1 m
1 m 0 dB
2 m -6 dB
4 m -12 dB
8 m -18 dB
10 m -20 dB
16 m -24 dB

The assumption collapses as soon as there is reflection. In an enclosed yard, in a wall corner, under a balcony, the sound comes back and the theoretical gain disappears. That is why a unit set 8 m away in a courtyard can be more intrusive than one at 4 m against an open façade.

Where placement is decided, on the survey

Record the open façade available, the possible discharge orientation, the position of glazing and bedrooms at the client's and at the neighbour's, the nature of the ground support, and any buried pipework in the discharge path. Note the condensate discharge point too. Those six observations are enough to lock in a defensible placement, and they apply just as much to the outdoor unit of a ducted air-to-air heat pump, whose indoor cabinet adds an acoustic constraint of its own, provided they are recorded during the survey, photos and equipment positions included, and that is the page you will produce if the position is challenged later. For the acoustic treatment itself, see heat pump noise and vibration.

The noise regime that applies, and what it means on the quotation

The assessment position, not the data sheet

The compliance figure is not the sound power level printed on the unit. It is a calculated sound pressure level at the assessment position, the closest neighbouring habitable room, after propagation and any barrier correction. Two identical units on two different plots give two different results, and only the calculation for that plot means anything.

The margin, and where it comes from

The calculation leaves a small number of levers: distance, the barrier correction where a solid screen breaks the line of sight, and the sound power level of the unit you select. A quieter unit at the specification stage is almost always cheaper than a screen retrofitted after a complaint. Run the numbers before the order, because after installation the only remaining lever is relocation.

What you write, and what you do not promise

Put the chosen placement on the quotation, the clearances respected, the anti-vibration support type and the unit's sound power level from the manual. Do not promise a figured gain for a screen or an enclosure without a before and after measurement on that site: catalogue values come from a laboratory and do not transfer to a courtyard. An unmet acoustic promise is a far more common reason for withheld payment than a shortfall in output.

Placement mistakes that make nuisance worse

Common field cases

  • Narrow yard: the 1,50 m discharge clearance comes before any acoustic gain, otherwise air recirculates.
  • Gable wall: avoid the party wall, which transmits straight into the neighbouring room.
  • Terrace: move away from dining areas and check the support can carry the load.
  • Roof: decoupled mounting, vibration checks and maintenance access.
  • Garden: stable, level ground, clear of pipework liable to freeze.

Poor supports and fixings: light walls, brackets, thin slabs

A heat pump set on too light a support turns every start-up into a resonance box. Favour a stable slab, anti-vibration pads sized to the machine's real weight, and calculated fixings. Avoid brackets on hollow walls or light framing without reinforcement, and check flatness. A single support defect is enough to transmit vibration into the structure, and then into the rooms.

Discharge orientation and rebound zones

Perceived noise often comes from the airflow hitting an obstacle. Do not place the unit facing a corner, an alcove, a recess or a nearby fence. Leave the 1,50 m clearance in front of the discharge, orient it toward an open area, and limit hard surfaces that bounce sound back. A quarter-turn changes the whole feel and costs nothing.

Securing the job and the neighbour relationship

Survey and photos before work

Before drilling or installing, do a joint survey with the client. Dated photos of façades, thresholds, planting, access points and meters. Mark the placement on the ground and note the constraints recorded, available clearances, likely reflections, position of neighbouring openings. That is your defence if the position is challenged after the fact.

Informing the neighbours without exposing yourself

Simply inform the neighbours. A note through the door is enough, with dates, hours, duration and a contact number. Stay factual and take on no acoustic commitment on the client's behalf. If you need access to their property or scaffolding, ask for a written agreement with dates and a commitment to make good.

Handover and sound check before leaving site

Check cleanliness, seals, fixings and anti-vibration mounts, then run the equipment and listen from the boundary, under load and again during defrost. Record the residual level with the machine off, it is the reference figure in any later dispute. If there is any disturbance, adjust orientation, pads or scheduling before you leave. To structure that step, use the essential commissioning checks and systematic quality control points.

Key figures

1,50 m

Discharge-side clearance benchmark

42 dB(A)

MCS 020 assessment position limit

-6 dB

Per doubling of distance, free field

Frequently asked questions

No single distance applies everywhere. What binds you first are the installation clearances: the French NF DTU 65.16, a useful benchmark where a manufacturer is silent, requires 0,50 m on the air intake side, 1,50 m on the discharge side, 1,50 m on the connection side for access, and 0,50 m above the unit, unless the manufacturer specifies more. Setback constraints then come from the local planning regime and from any deed or lease covenant, never from a national heat pump rule.

Share this article

Louis Meneteau

Louis is CPO of Argile. An engineer by training, he spent four years validating calculation software in systems engineering, then three years in software product. He turns the installer's daily reality into product workflows: technical survey, sizing, quotes and subsidy files. His articles describe field gestures rather than principles, because he watches them on site before specifying them.

Further reading

With argile

The site visit that fills in the file for you

On a phone, the technician documents the home and the project job by job: surveys, photos, equipment positions and sizing confirmed on the spot, with nothing to re-enter back at the office.

ContractorsApril 16, 2026
Heat pump noise and vibration: mitigation solutions

Under permitted development, MCS 020 sets the sound limit at 42 dB(A) at the assessment position, which after the nominal 40 dB(A) background leaves an effective emission limit of 37,0 dB(A). Everything else on site follows from that single figure: placement, support, settings, and a written trace of what you measured and corrected.

5 min read

ContractorsApril 14, 2026
Air-to-water heat pump defrosting: impact on winter performance

When the temperature drops, defrosting becomes the little pause that can make a client uneasy. As a tradesperson, you have everything to gain by simply explaining what's happening, when it's normal, and how to limit the loss of comfort and efficiency. With the right settings and a careful installation, winter stays a season of results, not surprises.

5 min read

Reveal your expertise

One demo, and you see your expertise proven.

Contact us