Blog/Energy performance guarantee: the performance contract
RGE sector

June 26, 2026

5 min read

Energy performance guarantee in 2026: securing your performance contract

On an energy renovation project, a promise of savings isn't something to sign lightly. With a results-oriented contract, you set a clear framework, measurable targets, and follow-up that avoids arguments at the end of the job. That means securing your margin, reassuring the client, and managing performance as a line item in its own right.

Understanding the energy performance guarantee and the performance contract

The difference between a best-efforts obligation and a performance guarantee (results obligation)

On a standard job, the tradesperson is usually under a best-efforts obligation: they implement techniques that comply with accepted standards, without promising a specific consumption figure. With a performance guarantee, you contract around a measurable target (kWh, euros, temperature, comfort). If the target isn't met under the agreed method, corrective actions or compensation may apply.

The work involved: insulation, heating, ventilation, regulation

Performance is rarely determined by a single trade. Contracts generally cover a "package" of work, to limit air leaks and setting drift.

  • Insulation and treatment of thermal bridges.
  • Heating, hot water production, and balancing.
  • Ventilation (flow rates, maintenance, air quality).
  • Regulation and control, with usage monitoring.

Who commits to what: tradesperson, engineering firm, operator, client

The engineering firm sets the baseline and does the sizing. The tradesperson commits to correct execution and settings. An operator may hold the performance contract and organize measurement over time. The client provides the data, follows the usage instructions, and handles maintenance. In 2026, clarity of responsibilities makes all the difference.

Framing the targeted performance: indicators, method, and evidence to produce

Choosing clear indicators: kWh/m²/year, actual consumption, summer/winter comfort

Set 2 or 3 benchmarks. A target in kWh/m²/year (derived from an energy performance certificate or an audit). Monitoring of actual consumption via bills or remote metering, distinguishing heating, hot water, and possibly cooling. And a comfort indicator, for winter (temperature reached) and summer (overheating, perceived comfort).

Defining the scope: usage, weather, occupancy, equipment, and settings

Performance depends on the framework. Specify the usage included, the reference weather (degree-days), occupancy, internal gains, and equipment. Note the key settings (setpoints, heating curve, ventilation, schedules). Otherwise, an "energy saving" could come from a change in behavior rather than from the work itself.

Measurement and verification: readings, metering, monitoring, and handover reports

Before, during, after. Keep simple evidence. Meter readings, photos of labels and settings, commissioning records, and 12-month monthly monitoring. The handover report lists tests, reservations, and documents delivered. That's your baseline for the guarantee.

  • Metering plan and measurement points.
  • Up-to-date manuals, as-built files, diagrams, and certificates.
  • Test results where they exist (flow rates, balancing, airtightness).

Drafting a solid performance contract: clauses that protect your guarantee

Essential clauses: targets, tolerances, duration, responsibilities, and exclusions

Set measurable targets (kWh, euros, comfort). Define the measurement method, the tolerances, and the commitment period. Clarify who does what between the works, operation, maintenance, and consumption monitoring. Add exclusions that prevent disputes (how the home is used, extensions, change of occupants, deliberate overheating). That's the basis of a guarantee that's easy to read.

Fine-tuning and setup plan: hydraulic balance, ventilation, programming

Include a dated fine-tuning plan. It should cover the hydraulic balance of the networks, ventilation flow rates, the heating curve, setpoints, and programming. Plan for a settings report and the handover of the manuals, so performance doesn't stay on paper.

Managing gaps: corrective actions, penalties, guarantee cap, and timeline

Organize the handling of gaps with a timeline. Diagnosis within X days, corrective actions, then a check. Plan a simple penalty or bonus mechanism, a guarantee cap, and the conditions for accessing data. You stay in control, without promising the impossible.

Limiting field risk: best practices for holding the guarantee day to day

Before the works: energy audit, technical visit, points of vigilance, and detailed quote

Before starting, secure the project with an energy audit or, at minimum, an on-site technical visit. Note the constraints. Existing ventilation, humidity, networks, access, drainage. Record them in the quote with clear assumptions and reservations if needed. A well-framed quote avoids misunderstandings that weaken the guarantee.

During the job: installation quality, traceability, product data sheets, photos, and checks

Install according to accepted standards, French technical guides (DTU), and manufacturer manuals. Keep simple traceability. References, serial numbers, technical data sheets, energy labels. Take photos at key stages before closing up. Run checks. Airtightness, settings, functional tests. This on-site evidence protects the guarantee in case of a dispute.

After the works: client support, manuals, maintenance, and consumption monitoring

At handover, provide a clear file. Plans, manuals, product data sheets, test reports, usage instructions. Explain the maintenance. Filtering, cleaning, contract, and frequency depending on the equipment. Offer a check-in after 1 or 2 months to verify the settings and monitor consumption. This follow-up limits callbacks and secures the guarantee.

Financing and compliance in 2026: aligning guarantee, performance, and contract

RGE, insurance, and responsibilities: ten-year liability, professional liability insurance, subcontracting, and joint contracting

In 2026, public financing and the ten-year liability guarantee are decided as early as the quote stage. Check for an up-to-date RGE qualification on the relevant trade. Also make sure professional liability insurance is active. In subcontracting, formalize the assignments and require proof of insurance. In joint contracting, clarify who handles the handover and the performance commitments.

Link with MaPrimeRénov' and CEE: documents to provide and consistency of performance targets

MaPrimeRénov' and CEE require detailed quotes and invoices, with RGE mentions, product specifications, and treated surface areas. Align the announced performance — for example, the thermal resistance of an insulation material or the efficiency of a heat pump — with the audit or the supported renovation pathway. That's the best way to avoid a payment being blocked or a request for further documents.

Documents to hand over: handover report, as-built file, certificates, and evidence

Hand over a dated handover report. Add a simple as-built file, manuals, diagrams, technical data sheets, and photo evidence. Plan for the MaPrimeRénov' end-of-works certificate and the CEE sworn statement, signed and consistent with the invoices.

Key figures

guaranteed savings over X years

Commitment

5 to 15 years

EPC duration

reimbursement

Penalty if not met

Frequently asked questions

Plan for at least one full heating season, often 12 months of monitoring, with monthly readings (bills or remote metering) and weather-adjusted data (degree-days). Add a 1-to-3-month fine-tuning period after handover to refine settings (heating curve, balancing, ventilation flow rates) before locking in the results.

Louis Meneteau

CPO of Argile

Further reading

RGE sectorJuly 25, 2026
District Heating Networks: How They Work and Their Benefits

When a job switches to district-scale collective heating, you often gain in operating simplicity and energy consistency, especially in major renovation. The principle is clear: centralised production feeds several buildings, and you mainly manage distribution, substations and balancing. For your clients, it means a more stable bill and fewer boilers to maintain, and for you, an opportunity to offer a clean, legible, profitable HVAC package.

5 min read

RGE sectorJuly 23, 2026
Refrigerant Log Book: The Traceability Requirement

On site, a leak sometimes comes down to a few grams, but it can cost you dearly if traceability isn't rock solid. A well-kept log book means less stress during an inspection, cleaner interventions, and a team that knows exactly what was added, recovered or replaced. Here's a rundown of what to record and the right habits to stay compliant, without unnecessary paperwork.

5 min read

RGE sectorJuly 22, 2026
Residential fuel cells: producing heat and electricity from gas

Producing heat and electricity at the customer's home, continuously, without complicating your life — that's a promise worth examining closely. On site, this type of system changes the game on sizing, connections and plant-room space, with some very concrete points to watch. If you're aiming for a coherent, RGE-compliant renovation, you save time by clarifying usage, available fuel and maintenance level from the outset.

5 min read

Reveal your expertise

One demo, and you see your expertise proven.

Contact us