
2026 subsidy FAQ: MaPrimeRénov', CEE and remaining cost
Which subsidies can your clients combine in 2026 (MaPrimeRénov' + CEE)?
Yes, combining them is possible in most cases. In practice, MaPrimeRénov' and a CEE bonus are drawn on for the same works, without double financing. The key point is the eligibility of the measure and meeting the conditions (works by an RGE-certified company, an eligible home, the household's income bracket). This FAQ item avoids bad surprises when filing.
What documents should you ask the client for to secure the subsidy application?
Ask for these from the start: tax notice (reference tax income), proof of identity, proof of ownership or tenancy, signed quote, bank details. Add the DPE or audit if required, and keep the detailed invoice. On the CEE side, plan for the sworn statement, dated and signed, and the equipment references.
How do you clearly explain the remaining cost and possible advance payments?
State a simple budget: quote price minus estimated subsidies equals remaining cost. Clarify that the bonuses may be paid after the works depending on the scheme, and that some situations allow for an advance. Say clearly what's certain, and what depends on the file being validated.
Works FAQ: insulation, ventilation and airtightness (the most common questions)
Which insulation should you choose (loft, walls, floors) depending on the client's house?
For this question, start from the building and how it's used. Loft first, since it's often the area with the most heat loss. In unconverted lofts, blown-in or laid insulation. In converted lofts, roof-slope insulation with proper vapour barrier management. For walls, external wall insulation avoids a lot of thermal bridges, while internal wall insulation is useful when the façade can't be touched. Ground floors are treated from underneath (cellar, crawl space) or from above if needed.
Why is ventilation (mechanical ventilation) essential after insulation work?
Insulating and improving airtightness reduces stray air infiltration. Without mechanical ventilation, humidity and pollutants build up. Healthy air and comfort depend on a suitable extraction rate and air inlets in good condition. In renovation, a humidity-controlled single-flow mechanical ventilation system is often a good compromise. Dual-flow is worth discussing mainly if the house is well sealed.
How do you address concerns about humidity, mould and condensation?
The problem rarely comes from the insulation itself. It comes from a poorly tuned trio: insulation, condensation and ventilation. You reassure the client by explaining the method: continuous airtightness, the vapour barrier in the right place, treatment of sensitive points (junctions, hatches), then checking the mechanical ventilation and its vents. If needed, measure humidity and look for water leaks before starting works. To go further on this topic, also see humidity-controlled single-flow mechanical ventilation.
Heating FAQ: heat pump, boiler and controls (what the client wants to know)
Heat pump: is it suited to the client's home and climate?
Content in preparation.
What real savings on the bill can your client expect after replacing the heating system?
Content in preparation.
How do you avoid bad surprises (sizing, noise, maintenance)?
Content in preparation.
Job-site FAQ: quotes, schedule and quality of execution (to reassure the client)
What should an energy renovation quote include to be clear and get accepted?
For this question, aim for a readable quote. Detailed line items, quantities, surface areas and expected performance levels (e.g. an insulation's thermal resistance, a heat pump's efficiency). Add product references, labour, prices before and after tax, VAT, validity period, payment terms, timelines. Also state your SIRET number, insurance, and RGE qualification if subsidies are being claimed. To go further on the requirements, see our article on mandatory information on a works quote.
What timelines should you announce to the client, and how do you handle job-site contingencies?
Announce a projected schedule with milestones. Realistic margin for supplies, weather, coordinating trades. If something unexpected comes up, inform the client quickly, explain the impact, propose a resumption date. Formalize any change with a signed amendment, with updated costs and timelines.
How do you demonstrate quality: photos, technical data sheets, tests and handover?
Document before, during, after: dated photos, technical data sheets, certificates (ACERMI, technical approval), instructions and commissioning reports. Depending on the work package, plan for mechanical ventilation airflow measurements, an airtightness test, adjustments. Finish with a written handover noting any reservations, and hand over the warranties.
Compliance FAQ: RGE, energy audit and inspections (simple answers for your clients)
Why does the RGE label matter to the client and for getting subsidies?
For your client, RGE certification reassures them about how seriously the job is being handled. And on the subsidy side, it's often a mandatory step. MaPrimeRénov' and most CEE bonuses require the works to be carried out by an RGE-certified company at the right time. Without this proof, the subsidy can be refused.
When is an energy audit useful or mandatory before works?
An audit is useful as soon as you want to avoid doing works "piecemeal." It helps choose the logical order: insulation, ventilation, heating. It becomes mandatory in most cases for comprehensive, supported renovation pathways, or when the goal is a genuine jump in energy class.
What happens in the event of an inspection: documents to keep and good practices?
In the event of an inspection (Anah, CEE body), keep signed quotes, detailed invoices, technical data sheets, certificates, before-and-after photos, and proof of commissioning. Good practice for your client FAQ: archive everything neatly, under the same name and address, and keep these documents for several years.
Key figures
how long will it take?
No. 3
how much does it cost?
No. 1
what subsidies are available?
No. 2
Frequently asked questions
Have the CEE commitment/sworn statement signed before the works start (and ideally before the quote is accepted), since a later signature or date can make the file ineligible. Keep proof of the date (dated quote, purchase order, email) and check that the invoice date and the completion date are consistent.

Pierre-Louis Guhur
CEO of Argile
