Blog/Integrated solar roofing: PV tiles and solar slates
Contractors

April 19, 2026

•

5 min read

Integrated solar roofing: PV tiles & solar slates (2026 tradesperson guide)

Between waterproofing rules, aesthetic constraints and the fear of "adding weight," your clients often hesitate to go solar on the roof. With integrated photovoltaic tiles and slates, you can offer a discreet result, with no compromise on the roof covering, provided you frame the installation and specific points from the quote onward. This secures your job and avoids bad surprises at handover.

Contents

Understanding integrated solar roofing: principles, uses and limits on site

Difference between integrated solar roofing (in-roof) and on-roof mounting: what you're really selling the client

With an in-roof system, the solar roofing replaces part of the covering. The system becomes a roofing element, with an aesthetic promise and sometimes a thickness gain. With on-roof mounting, the modules are installed above the tiles or slate. You're mainly selling a simpler, more reversible installation, and one that's often more tolerant of small irregularities in the substrate.

Compatibility with tiles, slate and substrates: slope, orientation, shaded areas

Compatibility first depends on the mounting system and the manufacturer's technical documents. Check the admissible slope, the continuity of the substrate, and the specific points. On the production side, a favourable orientation and the absence of nearby shading make the difference, even with careful installation.

Points of attention for waterproofing and ventilation: roofing underlay, air gap, verges and ridge

With an in-roof system, the priority is durable waterproofing. Take care with the roofing underlay, flashings, verges and ridge. Keep a consistent air gap to limit overheating and moisture. On site, a poorly treated detail shows up quickly, like a leak that always finds the shortest path.

Choosing between PV tiles and solar slates: decision criteria for a reliable installation

Aesthetic result and local constraints: ABF, local zoning plan and protected areas (common cases in 2026)

Before talking technical details, check the local rules. In a protected area, the ABF's approval can steer the choice toward a more discreet solar slate, or impose a specific colour and layout. Outside heritage zones, the local zoning plan (PLU) can still govern the appearance of solar roofing.

Power, output and usable area: sizing without overpromising

For the same area, the power mainly depends on the share that's actually active and on shading. A PV tile involves more joints and non-productive zones. A solar slate can optimise the layout, but requires a well-flat covering. Aim for realistic power, then adjust based on orientation, under-roof ventilation and losses, starting from output estimated by orientation and tilt.

Availability, accessories and maintenance: planning for parts, the array and replacements

The right choice is also one that can be maintained. Check the availability of hooks, verge pieces, ridge pieces, underlays and waterproofing kits. Require a clear parts list and compatible components to replace a single unit without redoing an entire slope.

Installing solar roofing: method, key steps and mistakes to avoid

Surveys and layout: array, spacing, cable runs and technical zones

Before installing solar roofing, start with a clean survey. Measure the rafters, locate the rafters and battens, then lay out an array that respects the fixing spacing. Reserve the cable runs, the inverter or micro-inverter zone, and the routes to the panel right away. A common mistake: laying out the array "by feel" and ending up with unnecessary cuts, cast shadows or visible cables.

Treating specific points: valleys, chimneys, roof windows, verges and eaves

Specific points determine the waterproofing. Treat them like a conventional roof covering. Flashings around chimneys and roof windows, upstands at verges, drainage at the eaves. Keep a safety distance and maintenance access. Avoid piercing an existing flashing or blocking roof ventilation.

Checks before energising: tightening, continuity, waterproofing and evidence photos

Before energising the system, check the torque on fixings, earth continuity, polarity and string insulation. Check waterproofing under simulated rain if possible. Take dated photos of the fixings, cable runs and labelling. These serve as evidence at handover and for after-sales service.

Safety, standards and insurance: securing your solar roofing job in 2026

DTU and best practice in roofing: what applies to PV tiles and slate

On solar roofing, you start from the roofing DTUs suited to the substrate. Series 40.2 for tiles, series 40.1 for slate. A PV tile or an integrated system must also comply with the manufacturer's requirements and, where applicable, a Technical Approval or DTA. Key points: fixings, ventilation, water drainage, wind and snow zones.

Electrical and fire safety: DC/AC protection, routing, emergency shutoff and labelling

On the electrical side, align with UTE C 15-712-1 and NF C 15-100. Plan for DC and AC protection, a surge arrester if required, and clean cable routing. Limit DC loops, avoid chafing, and protect penetrations. The emergency shutoff must be accessible, clearly identified, with durable labelling at the panel and as close as possible to the PV array.

Warranties, ten-year insurance and job file: traceability, manuals, handover report

Before starting work, check that your ten-year insurance covers both roofing and photovoltaic. Then your job file must hold up. Plans, diagrams, product references, serial numbers, manuals, required certificates (including electrical safety depending on the case), then signed handover and commissioning reports. This is your best safeguard in case of a dispute.

Grants and client procedures: how solar roofing fits into 2026 schemes

Feed-in tariff and VAT: the useful benchmarks to explain

For solar roofing with self-consumption and sale of the surplus, your clients benefit from a purchase obligation contract, but there's no longer an investment grant. Since the order of 5 June 2026, support has been limited to a single feed-in tariff of 1.1 c€/kWh (installations with P+Q ≤ 100 kWp), indexed by 2% per year for the whole contract duration. On the tax side, VAT mainly depends on the installed power and the type of building. For a home over 2 years old, a reduced rate may apply in certain cases, otherwise the standard rate applies.

CEE, MaPrimeRénov' and full renovation: cases where solar roofing combines (or doesn't)

In 2026, CEE and MaPrimeRénov' mainly target insulation, ventilation and heating. Photovoltaic is often outside their scope. However, solar roofing can be added onto a full renovation to lower the bill and secure the energy budget, without replacing the funded measures.

Connection and declarations: Consuel, Enedis, town hall, and timelines to anticipate

Warn the client early. Prior declaration to the town hall, then an Enedis application. If feeding into the grid, a Consuel certificate and a connection agreement. Then a purchase contract and commissioning. Timelines vary by grid and season. It's best to plan for several weeks, sometimes a few months.

Key figures

10 to 15%

PV tile output

nearly invisible

Appearance

€200 to €400/m²

Price

Frequently asked questions

For grid-connected photovoltaic, your client can aim for the feed-in tariff for surplus via an OA contract: the self-consumption bonus was abolished for applications filed from 5 June 2026 (order of 1 June 2026, article 9 repealed), and the surplus is bought at €0.011/kWh excluding tax over 20 years, indexed by 2% a year. VAT can be at a reduced rate for certain configurations in renovation, but it depends on the power, the type of work and the eligibility conditions: always check the exact case with the VAT statement on the quote and the tax framework in force.

Share this article

Pierre-Louis Guhur

Pierre-Louis is CEO and co-founder of Argile. He holds a PhD in machine learning, written at Inria, and renovated a house with his own hands in 2017 before founding the company. On the blog he writes about what he implements in the software: the 3CL-DPE 2021 method, NF EN 12831 and building physics as a calculation engine has to handle them, assumption by assumption.

Further reading

Camille Martin

/

Renovation plan

/

Air-to-air heat pump and solar PV

/

Solar PV installation

Back

Solar PV installation

Save the work

Electricity use

Roof pitches

3

Panel layout

4

Equipment selection

5

Projections

Next step

Panel layout

Panels

8

Output

4.0 kWp

Annual prod.

4,280 kWh

Self-use

74 %

Autonomy

32 %

Annual saving

€652

1

South pitch

(8)

Solar PV module, 500 Wp, monocrystalline

x8

500 Wp • €162.80

Inverters

Micro-inverter, 4 modules

x2

€352.00

Batteries

Add a battery

With argile

Sell solar PV with figures, not promises

Panels laid out on the roof, output estimated from orientation and tilt, self-consumption and export simulated: Argile turns your PV study into a sales argument.

ContractorsOctober 4, 2026
Solar panel production calculation to estimate output

To estimate photovoltaic output, start from the formula kWh/year = installed capacity (kWp) × plane-of-array irradiation (kWh/m²/year) × PR, with a PR typically kept between 0.75 and 0.85 on a standard roof (cables, temperature, inverter, mismatch, soiling). This range is what is used in practice; ADEME’s guide “How to choose your heat pump?” is not the right reference here, but ADEME commonly presents PR around 0.8 in its photovoltaic materials, and it provides a solid basis for a quote-level estimate before module layout. You then refine it using orientation and tilt via the “tilted-plane” irradiation (not horizontal), because for the same kWp the annual ratio varies significantly by area, as shown by public solar mapping tools (such as PVGIS) used in pre-studies.

5 min read

ContractorsJuly 4, 2026
Solar Self-Consumption with a Virtual Battery

Between bills that keep shifting and clients who want more autonomy, you’re often looking for a simple way to make the most of every kWh produced, without adding a technical room or a physical battery. The virtual battery answers exactly that need: it “sets aside” the energy fed into the grid so you can recover it later, with rules and costs that need to be clearly framed from the quote onward. In the lines that follow, we help you clearly explain the principle, the points to watch, and the right field practices to secure your job and keep your clients satisfied.

5 min read

Reveal your expertise

One demo, and you see your expertise proven.

Contact us