Combined solar system: solar heating + DHW in 2026 (CSS)

When a client wants to heat the house and produce hot water with the same installation, you're the one who has to quickly separate promises from job-site reality. With the right configuration, you can aim for concrete savings on the bill, without complicating maintenance or overloading the boiler room. Here's a rundown of the choices that really matter, from sizing to connection.

Contents

A combined solar system, or CSS, covers two uses with the same installation, domestic hot water and heating, where a solar water heater is limited to hot water. Orders of magnitude on a house are 10 to 20 m² of collectors for coverage of 50 to 70% of hot water demand and 25 to 50% of heating demand, the rest coming from a boiler, heat pump or immersion backup. A CSS only holds those levels on a home already insulated and fitted with low temperature emitters, underfloor heating or radiators sized for warm water. The pairing of collector area and cylinder volume is settled before ordering: too many collectors for the storage installed produces summer overheating and stagnation, which degrade the fluid and trigger callbacks.

Understanding the CSS: solar power serving heating and DHW

How it works: solar collectors, tank and backup heating

A CSS captures solar energy via thermal panels. A heat transfer fluid warms up, then passes its heat to a storage tank fitted with heat exchangers. The tank feeds DHW and, depending on the controller, a heating circuit. When the sun isn't enough, a backup (boiler, heat pump, electric element) takes over to guarantee the temperature.

Differences between CSS, solar water heater and "simple" solar thermal

A CSS covers two uses: hot water and heating. It generally requires more collector area and a larger tank. A solar water heater is limited to DHW. "Simple" solar thermal often targets a single, more occasional need (pre-heating, pool), with lighter hydraulics.

Which homes solar heating suits (area, insulation, emitters)

It's worthwhile if you have a well-exposed roof, room for the tank, and a home that is already insulated. The gain is better with low-temperature emitters, such as underfloor heating or radiators sized for lukewarm water. In renovation, an audit helps size accurately, without overpromising.

Sizing a combined solar system correctly: avoiding disappointment and callbacks

Assessing needs: heating, DHW, habits, climate zones

A combined solar system is first sized on real data: heating needs, DHW volume, number of occupants, hours of presence, comfort temperature. Add the climate zone and altitude. A well-insulated home completely changes the picture. Without this information, you oversell solar, the backup then runs constantly, and callbacks follow. On the heating side, Argile computes the home's heat losses to NF EN 12831-1 from the survey taken during the visit, which gives the solar sizing a solid base.

Choosing the right components: collector area, tank volume, controller, hydraulics

Aim for balance between collectors and storage. Too small, low gains. Too large, summer overheating and hydraulic constraints. Check tank insulation, stratification, expansion vessel, antifreeze protection and stagnation management. The controller must drive the circulators and prioritise the right exchanges, with well-placed sensors.

Managing the backup: boiler, heat pump, electric element... and DHW/heating priorities

The backup isn't a plan B, it's the co-pilot. Calibrate its power and setpoints to avoid conflicts. In practice, secure DHW first, then heating, with a clear sanitary priority logic. Clean integration limits short cycles, lukewarm returns and endless adjustments.

Installing a CSS on site: points of attention for lasting solar performance

Collector placement: orientation, tilt, shading, roof integration

Aim for well-oriented collectors, ideally due south. Keep a tilt consistent with the use, often around 30 to 60°. Watch for shading, trees, chimneys, dormer windows, especially in winter. On the roof, take care with waterproofing, ventilation under the collectors, and cable and pipe routing to limit losses.

Hydraulic schemes, safety and commissioning: bleeding, glycol, vessel, relief valves

A reliable CSS means a solar circuit that has been made safe. Plan suitable air vents, a correctly sized expansion vessel, relief valve, pressure gauge and check valves. At commissioning, bleed at sufficient flow rate, set the flow, then check the pressure. Check the glycol, antifreeze protection, pH, and the controller settings.

Maintenance and monitoring: checks to plan to preserve solar output

Solar power needs to be managed over time. Schedule an annual check of the pressure, relief valves, circulators and sensors. Monitor temperatures and energy produced to detect a drop in output. Check the glycol quality periodically and inspect the seals and the condition of the collectors (see also circuit pressure).

Grants and requirements in 2026: what to check for a compliant solar job

RGE and key documents: quote, technical datasheets, commissioning report, maintenance manual

For a solar job, check that the company holds a suitable RGE certification (photovoltaic or solar thermal). For the file, keep a dated and signed quote from before work starts, the equipment's technical datasheets, the commissioning report and the maintenance manual. Add the certificates required by the insurer and, if needed, electrical compliance.

Available grants depending on the case: MaPrimeRénov' and CEE (checks to do in 2026)

Careful, the ranking changed mid-year. Since 1 September 2026, the MaPrimeRénov' per-measure pathway only funds heat pumps, connection to a heat network, the energy audit and oil tank removal: solar thermal, both solar water heaters and combined solar systems, has been taken out. On a CSS sold on its own, MaPrimeRénov' therefore no longer enters the pricing, and the file only recovers it under the accompanied pathway, with criteria on the home, income and the number of energy classes gained. CEE can supplement this if the operation matches a standardised sheet and if the offer is accepted before work starts. Argile carries that funding into the funding plan and shows the remaining cost and the monthly instalments.

Compliance points: performance, compatibility, safety and best practice

Check the sizing, roof and structural compatibility, waterproofing, electrical protections and earthing. In solar thermal, monitor the hydraulic circuit and network insulation. In photovoltaic, secure the wiring and the connection. The goal is a durable and traceable installation.

Client pitch: selling a CSS without promising the impossible

Concrete benefits: comfort, lower consumption, complementarity with the backup

A combined solar system brings stable comfort. It preheats the hot water and supports heating when the sun is out. As a result, you consume less energy over the year, without changing habits. And above all, it works with the existing backup (boiler, heat pump, stove) which automatically takes over.

Simple figures and explanations: solar share, seasons, limits and realistic expectations

Explain the "solar share" as the portion of annual need covered by the collectors. It varies by region, insulation, usage and tank size. In winter, solar output drops and the backup does most of the work. In the quote, give ranges, base them on a study, and set realistic expectations about the return on investment.

Typical cases: high-performance renovation, family home, boiler replacement with solar DHW

It works well in high-performance renovation (reduced heat loss), in a family home with high DHW needs, or when replacing a boiler while keeping a backup, with solar DHW as the priority. You're selling a hybrid solution, not a promise of 100% free heating.

Key figures

25 to 50%

Heating coverage

10 to 20 m²

Collector area

50 to 70%

DHW coverage

Frequently asked questions

No longer per measure. Decree no. 2026-822 of 25 August 2026 took solar thermal out of the MaPrimeRénov' per-measure pathway for any application filed on or after 1 September 2026: a CSS sold on its own no longer opens a flat-rate grant. What remains is the CEE bonus, 5.5% VAT if the home is over 2 years old, and the zero-interest eco-loan, subject to eligible equipment and installation by an RGE QualiSol/QualiPAC-certified professional depending on the backup system. MaPrimeRénov' only reappears if the CSS is part of a whole-house renovation under the accompanied pathway. Have eligibility validated before signing and keep technical datasheets and certificates for the file.

Share this article

Louis Airy

Louis is COO of Argile. After four years in strategy consulting and close to two as chief of staff in home adaptation and reuse, he joined Argile in March 2024. In daily contact with certified renovation companies, he follows French energy saving certificates, renovation subsidies and reduced VAT, and revises the affected articles whenever a rate changes. What he writes is what he then checks against real quotes.

Further reading

Heat pump sizing note

Calculated to NF EN 12831-1

General information

Beneficiary

Mrs Margaret Hughes

Email

contact@argile.ai

Phone

+44 7700 900457

Works address

7 Rosewood Close, Sheffield

Air-to-water heat pump

Model

Alféa Extensa S. 10

Make

Atlantic

Rated output

10 kW

ηs at 35 °C / 55 °C

195 % / 154 %

COP

3,5

Controller

Classe VI

EPREL no.

2491075

Heat loss of the home

6,0 kW

Output at the design temperature

5,80 kW

3,59 kW

7,78 kW

0 %

60 %

130 %

Coverage of the demand

Equipment output / heat loss of the home

97 %

Sizing of the appliance

Roofs

Transmittance W/m².K

1,8

Area

65,2

Heat loss W/K

135,0

Floors

Transmittance W/m².K

0,6

Area

63,0

Heat loss W/K

15,6

Thermal bridges

Conductivity W/K/m

0,4

Lengths m

33,4

Heat loss W/K

12,5

Façades

Transmittance W/m².K

0,9

Area

162,4

Heat loss W/K

151,4

Openings

Transmittance W/m².K

1,2

Area

5,5

Heat loss W/K

10,9

Air renewal

Air change rate h⁻¹

0,8

Heat loss W/K

102,3

Temperature difference

Outdoor design temperature

-7 °C

Heat pump cut-off temperature

5 °C

Indoor set temperature

19 °C

DeltaT

14,0 °C

Construction coefficient

Volume (area × ceiling height)

378,0 m³

Equivalent G value

1,13 W/m³/K

With argile

The compliant sizing report, generated automatically

Compliant with EN 12831-1 and built from the data collected during the site visit, the sizing report comes out of the flow with no extra work, ready for the customer's file.

Camille Martin

/

Works plan

/

Financing

Whole-house retrofit

Generate the quote

Works

Financing

Cost of works and grants

Total cost of works

4 jobs

INSULATION

External wall insulation

18 400,00 €

Windows

3 260,00 €

HEATING AND HOT WATER

Air-to-water heat pump

14 900,00 €

Heat-recovery ventilation

1 840,00 €

Total amount

38 400 €

Grants

3 grants

MaPrimeRénov’

9 200,00 €

Energy saving certificates

3 480,00 €

Regional grant

1 520,00 €

Add a grant

Total grants

− 14 200 €

Remaining cost

Cost of works

38 400 €

Grants deducted

− 14 200 €

Grants land once the works are done: the financing plan covers the advance.

Remaining cost

24 200 €

Financing plan

How the works are paid for before the grants land at the end of the site

Loans

1 loan

Prêt Ecair

24 200 € · 15 ans · 3,4 %

Instalment

212 €

Ecair

Empruntis

Sofinco

Total borrowed

24 200 €

Advances on the grants

3 grants

The grants are advanced to the customer so they do not wait for the end of the works.

MaPrimeRénov’

9 200,00 €

Energy saving certificates

3 480,00 €

Regional grant

1 520,00 €

Total advanced

14 200 €

Personal contribution

No contribution asked on this project

Total contributed

0 €

With argile

The out-of-pocket cost, announced without nasty surprises

Public grants, energy-saving certificate bonuses and financing built into the pricing: the customer sees the real cost of their project, what is left to pay and their monthly instalments before signing.

Energy renovationMarch 19, 2026
Replacing a collective boiler: the decision-making journey

Replacing a collective boiler is often a mix of technical, budget and timing considerations. For you, the tradesperson, the real win is helping the building council decide quickly. By asking the right questions right away (breakdowns, consumption, boiler room constraints, subsidies), you turn an endless debate into a clear decision.

6 min read

Reveal your expertise

One demo, and you see your expertise proven.

Contact us